Case studies from complex, high-risk and access-restricted environments across Sydney and East Coast Australia.
Each project below demonstrates Hydro Logic's capability to deliver in environments where excavation is not viable, shutdowns are costly and the consequences of failure are high.
Trenchless Rehabilitation
01
UV cured-in-place pipe relining of a deteriorated oviform sewer at one of Australia's busiest public hospitals. All works conducted after hours with zero disruption to hospital operations.
Read Case Study
Trenchless Rehabilitation
02
Sea water infiltration through cracked and misaligned sewer joints was overwhelming the Sydney Water pump system. Completed 22 metres of lining in a single tidal window with same-night reinstatement.
Read Case Study
Industrial Protective Coating
03
Full recoating of two concrete wastewater treatment tanks at an operational beverage production facility. Confined space works completed in compliance with Asahi's site EHS requirements.
Read Case Study
CCTV Inspection
04
Comprehensive CCTV inspection of a complex stainless steel pipeline network at a bulk liquid terminal within the Sydney Ports precinct. Access achieved through a pigging and pull-rope system where tractor cameras could not navigate.
Read Case StudyEarly engagement allows us to assess asset condition, identify risk exposure and recommend the most appropriate rehabilitation strategy.